Building Integrated Solar Power Plant at Biju Patnaik Energy Park, Bhubaneswar

  • Client: Municipal Corporation
  • Location: Bhubaneswar
  • Surface Area: 120000 m2
  • Year Complete: 1996
  • Value: $50000
  • Supervising Engineer: Tom Shandy

The Building Integrated Solar Power Plant at Biju Pattnaik Energy Park is a state-of-the-art renewable energy project designed to harness solar power for sustainable electricity generation. This facility seamlessly integrates solar panels into the architecture, optimizing energy production while blending harmoniously with the environment.

Costumers Wishes

Our primary goal was to create an efficient, aesthetically pleasing solar power solution that aligns with the Energy Park’s vision for eco-friendly energy generation. The client desired a system that maximizes energy output while maintaining the park’s scenic beauty.

Finishing Process

The finishing process involved meticulous installation and alignment of solar panels across the designated area. Advanced techniques were employed to ensure the integration was flawless, guaranteeing optimal energy absorption. Additionally, a rigorous quality control process was implemented to meet the highest industry standards and fulfill the client’s expectations.